Is Building my Hawthorne Home with Modular Construction Faster than On-Site Construction?

Modular_Completed1157

Do you prefer efficiency, quality control, and fast building, with no setbacks due to weather conditions? If yes, the decision is clear! There are numerous reasons house construction gets postponed with traditional on-site construction, some inevitable and some that can be prevented. Weve listed only a few types of situations that may delay on-site construction, costing you a substantial length of time and money.

Weather

The most common reason for building setbacks is weather. Even though the weather in Hawthorne is usually fair, and there isn’t much concern about freezing temperatures,

Drying Time

An additional reason for schedule hindrances when building a house is the drying or curing process many materials need for on-site building. Many supplies, such as foundation and/or concrete basement walls, calls for significant amounts of curing time before construction can start back up.

Subcontractor No-Shows

It definitely isnt unheard for subcontractors not to ever show up for work on house building sites. There are many often reasonable reasons as to why contractors may be no-shows, but this can often cause a substantial amount of setbacks in the process! What are some of the costs added because of setbacks?

So what are some of the fees that are incurred when obstructions, unavoidable or inescapable, occur during on-site new home construction?

Interest Charges

If you took out a construction loan or any other kind of financing, for each and every day that gets postponed, interest is added to the loan. Since Manufactured homes are not subject to many setbacks, you will inevitably save on interest fees!

Insurance Costs

For on-site builds, the required insurance of subcontractors is usually based on a particular time period. If this length of time gets elongated because of delays, it will be necessary to extend the insurance costs. Since prefabricated homes do not require on-site builds, the fees of insurance delays are significantly reduced!

Equipment Rental costs

For an on-site house build, it will be necessary to lease portable toilets, equipment, etc. for the on-site workers. Every day that is added because of delays incurs extra fees to your budget.

Modular houses offer the customization and financing available for on-site home builds, but eliminate the stress, trouble, and setbacks that cost you time and money. With modular homes built in Hawthorne, building your dream home is never delayed by unpredictable weather, subcontractor no-shows, missing or stolen supplies, and many other setbacks that are a common occurrence on standard building sites.

With prefabricated houses, your fully customized modern house travels to a local Hawthorne workstation, where building trades are represented. US Modular has a 2 tiers of quality assurances checks. First, in-plant inspectors check every inch of the house then independent inspection agencies inspect the home on behalf of the state of California and the Hawthorne government.

By utilizing top quality engineering and the latest modular building techniques, USModular is able to significantly increase the energy efficiency of your house. Our unique quality control process provides you with complete, 100% assurance guarantee that your house has been thoroughly inspected for code compliances, top quality workmanship, and perfection.

Visit our site for more details on modular homes!