Is Building my Temecula Home with Modular Construction Faster than On-Site Construction?

Modular_Completed1128

Do you prefer efficiency, quality control, and speedy manufacturing, with no delays due to weather conditions? If yes, the decision is clear! There are countless reasons new home construction goes over schedule with standard on-site construction, some inescapable and some that can be prevented. Weve listed some instances of situations that could delay on-site construction, costing you a significant length of time and money.

Weather

The most common reason for building delays is weather. Although the weather in Temecula is usually fair, and there isn’t much concern about freezing temperatures,

Drying Time

One more reason for schedule setbacks when building a new home is the curing or drying process many materials need for on-site manufacturing. Many components, such as foundation and/or concrete basement walls, warrants significant amounts of drying time before construction can start back up.

Subcontractor No-Shows

It definitely isnt unheard for subcontractors not to show up for work on new home building sites. There are many often valid reasons as to why contractors may be no-shows, but this can often cause a significant amount of delays in the process! What are some of the costs incurred because of delays?

So what are some of the fees that are added when holdups, unavoidable or unpreventable, happen during on-site customized home construction?

Interest Charges

If you took out a construction loan or any other kind of financing, for each and every day that goes over schedule, interest is added to the loan. Since Manufactured homes are not subject to many delays, you will inevitably save on interest fees!

Insurance Costs

For on-site builds, the required insurance of subcontractors is usually based on a particular time period. If this length of time gets extended because of delays, it will be necessary to extend the insurance costs. Since prefab homes do not require on-site builds, the fees of insurance delays are significantly reduced!

Equipment Rental costs

For an on-site new home build, it will be necessary to book portable toilets, equipment, etc. for the on-site workers. Every day that is added because of delays tacks on extra fees onto your budget.

Modular properties can offer the customization and financing available for on-site home builds, but eliminate the stress, trouble, and delays that cost you time and money. With modular homes built in Temecula, building your dream home is never delayed by unpredictable weather, subcontractor no-shows, missing or stolen components, and many other delays that are a common occurrence on traditional building sites.

With prefab properties, your fully customized modern new home travels to a local Temecula workstation, where we have building trades are represented. US Modular has a 2 tiers of quality assurances checks. First, in-plant inspectors check every inch of the new home then independent inspection agencies inspect the home on behalf of the state of California and the Temecula government.

By utilizing excellence engineering and the latest modular manufacturing techniques, USModular is able to significantly increase the energy efficiency of your new home. Our unique quality control process provides you with complete, 100% assurance guarantee that your new home has been thoroughly inspected for code compliances, excellence workmanship, and perfection.