The Faster Timeline of Modular Long Beach Homes vs. Site Built Homes
Can USModular really build my Long Beach Modular Home faster?
YES! Through our streamlined planning process, controlled building conditions, and capability to avoid setbacks due to weather, we can build your new dream home in less than 50% of the amount of time of traditional, on-site constructed homes without forgoing quality!
Streamlined Planning
USModular can complete your customized home faster because we make sure that everything is taken care of before the home goes under construction. The construction plans are created and ready, permits are in-hand, supplies are ordered and accounted for, and the staff is ready to begin work immediately. Since our prefabricated homes are not exposed to the extreme Long Beach heat, rain, and the elements, we can not only eliminate setbacks, but can prevent problems such as mold, weather damages, and warped wood during building!
What is the Usual Timeline for Modular Homes?
The length of time to build a custom modular home will differ greatly depending on the type and size of the modular house built. Typically, the modular home building process can begin within around 4-6 months after the required building permits are obtained. The standard modular house is usually completed within 21 to 30 days from the time the building permits were obtained.
Within 5 weeks of completion, the custom new home is shipped to the building locale. The prefabricated home is then built into the previously constructed foundation and is completed within 4 to 6 weeks from the on-site shipping date. The complete modular home building process takes roughly 6 – 9 months, from start to finish.
What is the Expected Timeline for Site Built Homes?
Its almost impossible to predict an exact time span needed for a site built home. So many setbacks and disruptions can occur due to for several explanations, and these delays can cause considerable extensions in pre-planned timelines. A site built home may leave restless customers waiting 12 to 18 months for a substandard project to be finished. This discouraging timeframe can leave you with considerably higher expenses you had not previously taken into account!