The Faster Timeline of Modular El Monte Homes versus Site Built Homes
Can USModular really build my El Monte Modular Home faster?
YES! Through our streamlined planning process, regulated construction conditions, and ability to prevent obstructions caused by weather, we can usually build your new dream home up to 50% of the time of traditional, on-site constructed homes without sacrificing quality!
Streamlined Planning
USModular can complete your new dream home faster because we guarantee that all the filing, permitting, and planning is complete before the home goes into the building process. The construction plans are drafted and set, permits are in-hand, building materials are ordered and ready, and our workers is ready to begin work immediately. Since our new modular homes are not subjected to the extreme El Monte heat, rain, and the elements, we can not only eliminate obstructions, but can prevent problems such as weather damages, warped wood, and mold during construction!
What is the Expected Timeline for Modular Homes?
The time span needed to build a new prefab home will fluctuate greatly depending on the size and type of the modular home built. In most cases, the modular home construction process can begin within 4 to 14 months after the needed building permits are obtained. The average modular home can be finished within 21 to 30 days from the time the construction permits were obtained.
Within 34 days of completion, the custom new home is transported to the building foundation. The new modular home is then set in to the pre-constructed foundation and is finished within 4 to 6 weeks after the relocation date. The entire modular home construction process takes about 6 – 9 months, from start to finish.
What is the Normal Timeline for Site Built Homes?
Its very difficult to estimate an exact timeline for a site built home. So many obstructions and disruptions can occur caused by for many excuses, and these delays can cause a great amount of extensions in pre-planned timelines. A site built home may leave stressed home buyers waiting a full year to 18 months for an inferior project to be completed. This overwhelming timeframe can leave you with extensively higher fees you had not taken into consideration!