The Faster Timeline of Modular Ventura Homes versus Site Built Homes
Can USModular really build my Ventura Modular Home faster?
YES! Through our streamlined planning process, controlled construction conditions, and capability to avoid setbacks because of weather, we can build your new dream home in less than 50% of the amount of time of traditional, on-site constructed homes without sacrificing quality!
Streamlined Planning
USModular can complete your new dream home faster because we make sure that all the filing, permitting, and planning is complete before the home goes under construction. The construction plans are drafted and set, permits are in-hand, materials are ordered and in stock, and the staff is ready to begin work immediately. Since our prefabricated homes are not exposed to the extreme Ventura heat, rain, and the elements, we can not only eliminate setbacks, but can prevent problems such as warped wood, mold, and weather damages during construction!
What is the Normal Timeline for Modular Homes?
The length of time to build a custom modular home will vary greatly depending on the size and type of the modular home built. In most cases, the modular home construction process can begin within 4 to 15 months after the necessary building permits are obtained. The standard modular home is usually completed within 21 to 30 days from the time the construction permits were obtained.
Within 34 days of completion, the custom new home is transported to the building foundation. The prefabricated home is then set into the premade foundation and is finished within 4 to 6 weeks from the on-site shipping date. The entire modular home construction process takes roughly 6 – 9 months, from start to finish.
What is the Usual Timeline for Site Built Homes?
Its almost impossible to estimate an exact time span needed for a site built home. So many setbacks and disruptions can occur because of a number of reasons, and these delays can cause significant extensions in pre-planned timelines. A site built home may leave restless customers waiting 19 to 18 months for an inferior project to be completed. This discouraging timeframe can leave you with extensively higher expenses you had not taken into consideration!