The Faster Timeline of Modular Murrieta Homes vs. Site Built Homes
Can USModular really build my Murrieta Modular Home faster?
YES! Through our streamlined planning process, efficient construction conditions, and ability to avoid interruptions due to weather, we are able to build your new dream home in less than half of the time of traditional, on-site constructed homes without sacrificing quality!
Streamlined Planning
USModular can complete your new dream home faster because we ensure that all the filing, permitting, and planning is complete before the home goes into production. The construction plans are drafted and set, permits are in-hand, supplies are ordered and accounted for, and the crew is ready to begin work immediately. Since our new prefab homes are not subjected to the extreme Murrieta heat, rain, and the elements, we can not only eliminate interruptions, but can prevent problems such as mold, weather damages, and warped wood during construction!
What is the Usual Timeline for Modular Homes?
The amount of time to build a custom prefabricated home will differ greatly depending on the size and type of the modular home built. In most cases, the modular home construction process can begin within 4 to 16 months after the required building permits are obtained. The typical modular home can be completed within 21 to 30 days from the time the construction permits were obtained.
Within 34 days of completion, the custom new home is transported to the building foundation. The new prefab home is then built into the previously constructed foundation and is finished within 4 to 6 weeks from the shipping date. The entire modular home construction process takes approximately 6 – 9 months, from start to finish.
What is the Expected Timeline for Site Built Homes?
Its nearly impossible to estimate an exact length of time for a site built home. So many interruptions and disruptions can occur due to for several explanations, and these delays can cause major extensions in pre-planned timelines. A site built home may leave anxious buyers waiting 20 – 18 months for an inferior project to be completed. This daunting timeframe can leave you with extensively higher costs you had not taken into consideration!