Is Building my El Cajon Home with Modular Construction Faster than On-Site Construction?

Modular_Completed1148

Do you prefer efficiency, quality control, and quick construction, with no hindrances due to conditions? If yes, the best choice is clear! There are many excuses home construction gets delayed with standard on-site construction, some unavoidable and some that can be anticipated. These are just a few examples of scenarios that could potentially delay on-site construction, costing you a significant length of time and money.

Weather

The most common reason for building hindrances is weather. While the weather in El Cajon is usually fair, and there isn’t much concern about freezing temperatures,

Drying Time

Another reason for schedule holdups when building a home is the curing or drying process many materials need for on-site construction. Many materials, such as foundation and/or concrete basement walls, requires significant amounts of drying time before construction can proceed.

Subcontractor No-Shows

It certainly isnt unusual for subcontractors never to show up for work on home building sites. There are many often legitimate excuses as to why contractors may be no-shows, but this really does cause a significant amount of hindrances in the process! What are some of the costs incurred caused by hindrances?

So what are some of the extra costs that are added when interruptions, unavoidable or inevitable, happen during on-site house construction?

Interest Charges

If you took out a construction loan or any other kind of financing, for each day that gets delayed, interest is added to the loan. Since Panelized homes are not subject to many hindrances, you will inevitably save on interest extra costs!

Insurance Costs

For on-site builds, subcontractors liability insurance plans is usually based on a previously established building schedule. If this time period gets increased caused by delays, it will be required to extend the insurance costs. Since custom modular homes do not require on-site builds, the extra costs of insurance delays are significantly reduced!

Equipment Rental costs

For an on-site home build, it will be required to rent portable toilets, equipment, etc. for the on-site builders. Each and every day that is added caused by delays adds even more extra costs to the bottom line.

Modular homes offer all the customization and financing available for on-site home builds, but eliminate the trouble, headaches, and hindrances that cost you time and money. With modular homes built in El Cajon, building your ultimate home is never delayed by unpredictable weather, subcontractor no-shows, missing or stolen materials, and many other hindrances that are a common occurrence on traditional building sites.

With custom modular homes, your fully customized modern home travels to a local El Cajon workstation, at which all building trades are accounted for. US Modular has a 2 tiers of quality assurances checks. First, in-plant inspectors check each and every inch of the home then independent inspection agencies inspect the home on behalf of the state of California and the El Cajon government.

By utilizing high quality engineering and the latest modular construction techniques, USModular is able to significantly increase the energy efficiency of your home. Our unique quality control process provides you with complete, 100% assurance guarantee that your home has been thoroughly inspected for code compliances, high quality workmanship, and perfection.

Visit our site for more details on modular homes!