Is Building my Long Beach Home with Modular Construction Faster than On-Site Construction?

Modular_Completed1104

Do you prefer efficiency, quality control, and fast building, with no setbacks due to climates? If yes, the choice is clear! There are numerous explanations house construction gets postponed with traditional on-site construction, some inevitable and some that are avoidable. Weve provided only a few types of circumstances that often delay on-site construction, costing you a substantial length of time and money.

Weather

The most common reason for building setbacks is weather. Even though the weather in Long Beach is usually fair, and there isn’t much concern about freezing temperatures,

Drying Time

An additional reason for schedule hindrances when building a house is the drying or curing process many materials need for on-site building. Many supplies, such as foundation and/or concrete basement walls, calls for significant amounts of curing time before construction can start up again.

Subcontractor No-Shows

Its not uncommon for subcontractors to never show up for work on house building sites. There are many often reasonable explanations as to why contractors may be no-shows, but this can cause a substantial amount of setbacks in the process! What are some of the costs added due to setbacks?

So what are some of the expenses that are incurred when obstructions, unavoidable or inescapable, occur during on-site new home construction?

Interest Charges

If you took out a construction loan or any other kind of financing, for every day that gets postponed, interest is added to the loan. Since Modular homes are not subject to many setbacks, you will inevitably save on interest expenses!

Insurance Costs

For on-site builds, liability insurance for subcontractors is usually based on a specific length of time. If this building schedule gets prolonged due to delays, youll be required to extend the insurance costs. Since prefabricated homes do not require on-site builds, the expenses of insurance delays are significantly reduced!

Equipment Rental costs

For an on-site house build, youll be required to lease portable toilets, equipment, etc. for the on-site staff. Each day that is added due to delays incurs additional expenses to your budget.

Modular houses offer the customization and financing available for on-site home builds, but eliminate the headaches, effort, and setbacks that cost you time and money. With modular homes built in Long Beach, building your perfect home is never delayed by unpredictable weather, subcontractor no-shows, missing or stolen supplies, and many other setbacks that are a common occurrence on standard building sites.

With prefabricated houses, your fully customized modern house travels to a local Long Beach workstation, where building trades are present. US Modular has a 2 tiers of quality assurances checks. First, in-plant inspectors check each inch of the house then independent inspection agencies inspect the home on behalf of the state of California and the Long Beach government.

By utilizing top quality engineering and the latest modular building techniques, USModular is able to significantly increase the energy efficiency of your house. Our unique quality control process provides you with complete, 100% assurance guarantee that your house has been thoroughly inspected for code compliances, top quality workmanship, and perfection.